Project Name Construction of Single line BG Tunnel No 12 (approx Total length 9551 Mts) at Km 105.840 to Km 115.391 Adit (1440 Mts) and Adit -2 (420 Mts) in between Tupul-Imphal in connection with construction of New Railway line project Jiribam-Tupul
Client NF Railway (Construction)
Project Name Construction of Parallel Safety tunnel of T-12 at Km 105/650 to Km 115/176 in between Tupul-Imphal in connection with construction of new railway line project Jiribam-Imphal of NF Railway
Client NF Railway (Construction)
Project Name Construction of Imphal-Kangchup-Tamerglong Road in the State of Manipur under SASEC Road Connectivity Investment Program (SRCIP), ADB Loan No 3118-IND Tranche – 1
Client NF Railway (Construction)
Project Name Construction of Fibre Lining for Adit tunnel of Tunnel No.1,3,7,6A,6B, 10 and 12 in between station Vangicungpao & Khongsang in connection with Construction of New Railway Line Project Jiribam to Tupuul (Imphal)
Client NF Railway (Construction)
Mizoram
Project Name Construction of Single Line BG Tunnel 15A (UG App. Length 182 RM) at Km 27.211 to Km 28.393, Tunnel 15B (UG App. Length 200 RM) at Km 28.640 to Km 28.840, Tunnel 15C (Cut & Cover App. Length 190 RM) at Km 29.220 to Km 29.410, including all other ancillary works in between station Hortoki and Mualkhang in connection with construction of New BG Railway Line Bairabi-Sairang (Mizoram).
Client NF Railway (Construction)
Project Name Construction of single line BG Tunnel 14A (App. length 160 RM) at Km. 27.300 to Km. 27.460, two line BG Tunnel 12A (App length 160 RM) at Km. 25.360 to Km. 25.520 and balance work of Tunnel 11C (Cut & Cover App. length 120 RM) Including all other ancillary works in between stations Hortoki and Mualkhang, in connection with Construction of New BG Railway Line Bairabi-Sairang (Mizoram).
Client NF Railway (Construction)
Project Name Construction of UG Tunnel No.5 and Cut and Cover Tunnel 2B, C& C no,2C, C&C No. 2D, Balance Work of C&C No.5A and Balance Work of UG Tunnel No.3 and UG Tunnel T4 including all related ancillary works, Protection Works, Construction of Side Drains etc in between Stations Bairabi and Hortoki in Connection with New BG Railway Line Bairabi -Sairang (Mizoram).
Client NF Railway (Construction)
Project Name Construction of Cut & Cover Tunnel No. 1C (Approx. length – 90m) at Ch. 6.550 Km to 6.640 Km, C&C No. 2A (Approx. length – 50m) at Ch.6.550 Km to 6.640 Km, works of C&C No. 1B (Approx.length – 150m-RCC Box) and UG Tunnel No. 2 (UG Lining of Approx. Length 460m)at Ch. 7.123 Km to 7.583 Km including all related ancillary works, Protection works, construction of side drains, etc in between stations Bairabi and Hortoki in connection with Construction of New BG Railway Line Bairabi-Sairang (Mizoram) .
Client NF Railway (Construction)
Jammu
Project Name Construction of Tunnel T- 13, PART Tunnel T-14 including station yard at Basindadhar, Approach road from Adit of T-13 (Khanikote) to P2 of T-13 and P1 of T-14 Basindadhar and bridge no. 60 (between km 61.004 to km 73.785 approx.) on Katra- Banihal Section of Udhampur
Client Konkan Railway Corporation Limited
Delhi
Project Name Design & Construction of Twin tunnel of Janakpuri West to R. K Ashram Corridor of Phase IV of Delhi Metro
Client DMRCL
Telangana
Project Name SRLIP Package No 14 SRLIP to Paleru Link Canal works Earthwok, Embankment & CC Lining From Km 10.50 to Km 39.50
Client I & CAD,Telangana
Andhra Pradesh
Project Name Construction of Andhra Pradesh Pollution Control Board Office Building at Tirupathi
Client APSPHCL Andhra Pradesh
Project Name Construction of Auditorium at R.K.Valley – IIIT Idupulapaya of Y.S.R. Kadapa District
Client APSPHCL Andhra Pradesh
Project Name Construction of Class room complex G+3 at IIIT – Srikakulam
Client APSPHCL Andhra Pradesh
Karnataka
Project Name
JSW Steel Limited, Karnataka Some Major Industrial Buildings like Coke Oven, Steel Making Shop, Blast Furnace, Hot Strip Mill
Client
JSW Steel Limited
Maharashtra
Project Name
The present leasehold area of Walni U/G Mine Boundary is 233.00 hectares and the area proposed for mining by Mine Development cum Operating. The Walni U/G Mine falls in Silewara-Kamptee Coalfield. The Walni mine extractable reserves is 8.99 Mt
Contract Period : 25 yrs
Client
Western Coalfields Limited
Jharkhand
Project Name
The Gopinathpur UG mine is located in western most part of Raniganj coalfields in Dhanbad district.The mining lease of Gopinathpur colliery is 520 ha. The area is located in the Mugma basin which is an integral part of the Raniganj Coalfield and occupiesthe trans-Barakar area in Dhanbad District of Jharkhand.
Contract Period : 25 yrs
Client
Eastern Coalified Limited
Project Name
Loyabad Colliery is situated in Dhanbad district of Jharkhand. Loyabad Colliery is located in the central part of Jharia Coalfield. The colliery is under administrative control of Sijua area of BCCL.
Contract Period : 25 yrs
Client
Bhart Coking Coal Limited
West Bengal
Project Name
LOCATION OF THE MINE Girmint-KD Incline UG is located in the central part of Raniganj Coalfield in Burdwan district of West Bengal state of India.The mining leases of Girmint colliery and KD incline are 285 Ha and 345 Ha respectively. However, some area of Bhanora colliery and Sripur colliery is to be readjusted for keeping a vertical boundary